Project Overview
QEI delivered the solar, electrical and air-conditioning works for the builder, NthStar Constructions, on a large commercial facility in Rocklea that was being repaired and upgraded after a hailstorm. The works were completed in 2025.
Before the new roof could go on, the site’s 480 existing solar panels had to come off. QEI took them down, kept them safe on site while the roof works went ahead, and refitted them once the new roof was finished.
QEI also designed and installed 150 kW of new rooftop solar to bring down the facility’s energy costs, and supplied, installed and connected 160 kW of new air conditioning. With the facility open for business the whole way through, the works were planned to keep disruption to a minimum, and every system was tested and documented at handover.
What QEI Delivered
- Take-down, on-site storage and refit of 480 existing solar panels around the new roof
- Design and installation of 150 kW of new rooftop solar
- 160 kW of new air conditioning: supply, installation and electrical connection
- Works planned around a site that stayed open throughout
- Testing and handover documentation for every system